Today's Inspections

 
PERMITADDRESSINSPECTIONINSPECTORTIMERESULTCOMPLETED
Data pager
Data pager
123
Page size:
PageSizeComboBox
select
 46 items in 3 pages
362 FITZPATRICK RDINT LATH/DRYWALLJOHN RODRIGUEZTBDPASS08/12/2020 
362 FITZPATRICK RDEXTERIOR LATHJOHN RODRIGUEZ02:00 PMPASS08/12/202002:00 PM
368 FITZPATRICK RDINSULATIONJOHN RODRIGUEZTBDPASS08/12/2020 
1134 SAN ELIJO RD SINSULATIONDAVID YORBA10:30 AMPASS08/12/202010:30 AM
162 DIAMANTE RDGAS LINE AIR TESTJOHN RODRIGUEZ09:30 AMPASS08/12/202009:30 AM
512 LEDGE STPOOL STEELDAVID YORBA09:00 AMPASS08/12/202009:00 AM
512 LEDGE STPOOL PLUMBINGDAVID YORBATBDCORRECTION NOTICE08/12/2020 
285 INDUSTRIAL STROUGH MECHANICALJOHN RODRIGUEZ09:00 AMPASS08/12/202009:00 AM
941 PEARL DRFOUNDATIONDAVID YORBA10:00 AMNOT READY08/12/202010:00 AM
1126 SAN ELIJO RD SINSULATIONDAVID YORBA10:30 AMPASS08/12/202010:30 AM
1126 SAN ELIJO RD SFRAMEDAVID YORBA10:30 AMPASS08/12/202010:30 AM
1116 SAN ELIJO RD SINSULATIONDAVID YORBA10:30 AMPASS08/12/202010:30 AM
1369 ROCK CTPOOL BONDINGJOHN RODRIGUEZ12:30 PMPASS08/12/202012:30 PM
1705 BLUE WATER LNPRE-PLASTERDAVID YORBA11:00 AMCORRECTION NOTICE08/12/202011:00 AM
564 VIA DEL CABALLOFINAL BUILDING**DAVID YORBA11:30 AMPASS08/12/202011:30 AM
564 VIA DEL CABALLOFINAL PLUMBINGDAVID YORBA11:30 AMPASS08/12/202011:30 AM
952 PEARL DRMASONRY LIFTSJOHN RODRIGUEZTBDPASS08/12/2020 
952 PEARL DRFOUNDATIONJOHN RODRIGUEZ12:30 PMPASS08/12/202012:30 PM
1619 SADDLEHORN DRFINAL MECHANICALJOHN RODRIGUEZTBDPASS08/12/2020 
1619 SADDLEHORN DRFINAL BUILDING**JOHN RODRIGUEZ1:30 PMPASS08/12/20201:30 PM
 

The inspection time shown is within a two hour window. The time shown is  only an estimation.